Supply of labor, consumables, tools, equipment, site supervision and quality assurance necessary for the fabrication, delivery to site, and site assembly/installation/erection for the completion of the said project. (Inset is the two (2) units – 1,500 Cu. M. De-mineralized Water Tank, two (2) units – 200 Cu. M. UF Water Tank, and one of the two (2) units – 100 Cu. M. Seawater Desalination Tank.)